The work that should have been over last month is not expected to be completed by 2024-end.
The construction of Mumbai Metro’s line 3 has led to a 200m stretch on Lamington Road, which connects Dadar and Girgaon Chowpatty, being dug up one lane and barricaded on the other. This has resulted in half of the shops being shut. Also affected are the pedestrians.
https://indianexpress.com/article/cities/mumbai/mumbai-metro-line-local-businesses-8031788/
Source – Indian Express