The 320-metre stretch between Amar Mahal junction to Sahakar junction is being widened and the mid-section of the road has been dug up for the completion of the Metro line 4.
Source – Indian Express
The 320-metre stretch between Amar Mahal junction to Sahakar junction is being widened and the mid-section of the road has been dug up for the completion of the Metro line 4.