Mankhurd RoB widening: From 4 to 8 lane connectivity

Rs 52 crore project to ease travel between Mumbai, Navi Mumbai & JNPT

The Maharashtra Rail Infrastructure Development Corporation (MRIDC), also known as MahaRail, is aiming to complete the widening work of the Mankhurd road-over-bridge (RoB) by the end of the current financial year. Currently, this RoB has only four lanes – two on either side – and two more lanes on each side are being added, giving it eight lanes once the work is completed.

https://www.freepressjournal.in/mumbai/mankhurd-rob-widening-from-4-to-8-lane-connectivity

Source: The Free Press Journal

Leave a Reply

Your email address will not be published. Required fields are marked *