Rehabilitation Dispute Stalls Airoli–Kalwa Rail Corridor Survey In Mumbai
December 6, 2025: The Airoli–Kalwa elevated rail corridor has encountered a fresh setback, with the Thane unit of the NCP–Sharadchandra…
December 6, 2025: The Airoli–Kalwa elevated rail corridor has encountered a fresh setback, with the Thane unit of the NCP–Sharadchandra…
July 18, 2025: Mumbai’s long-anticipated Airoli–Kalwa elevated suburban rail corridor—envisioned to decongest Thane station and enhance cross-city connectivity—has run into…