
Carnac Bridge Work Resumes After Girders Setback; Rs1.8 Cr Penalty For Contractor
After a 15-day delay, construction has resumed on Mumbai’s much-anticipated Carnac Bridge, which had stalled due to a setback in…
After a 15-day delay, construction has resumed on Mumbai’s much-anticipated Carnac Bridge, which had stalled due to a setback in…
In a determined push to accelerate critical infrastructure works before the onset of the monsoon, the Brihanmumbai Municipal Corporation (BMC)…