Mumbai March Flags Suburban Infrastructure Gaps, Calls For Time-Bound Civic Action
January 13, 2026: As Mumbai prepares for the BMC elections in 2026, Mumbai March, a citizen collective representing residents of…
January 13, 2026: As Mumbai prepares for the BMC elections in 2026, Mumbai March, a citizen collective representing residents of…
January 12, 2026: The critical road connection between Mumbai’s Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and the Navi Mumbai…
January 3, 2026: A newly opened shortcut road at Kapadia Nagar Junction in Mumbai has been introduced to ease traffic…
November 12, 2025: Mumbai’s skyline is being reshaped as five major bridge reconstruction projects—at Byculla, Mahalaxmi, Bellasis, Elphinstone, and Sion—advance…
November 10, 2025: The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated the preparation of a detailed project report (DPR)…
November 04, 2025: Mumbai’s transport infrastructure is set for another major leap, with the Mumbai Metropolitan Region Development Authority (MMRDA)…
September 22, 2025: The Brihanmumbai Municipal Corporation (BMC) has unveiled plans for a 4.2-kilometre flyover along the heavily congested LBS…
September 10, 2025: Motorists on the 25-km Western Express Highway (WEH) between Dahisar and Mahim could soon experience a seamless…
September 2, 2025: The Brihanmumbai Municipal Corporation (BMC) has begun a major repair and strengthening project on the Jog flyover…
August 29, 2025: The Brihanmumbai Municipal Corporation (BMC), which is currently undertaking repair and strengthening work on the Jog flyover…