Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
Marine Drive - Worli Section To Be Ready By November - Re-mumbai

Re-mumbai

Marine Drive – Worli Section To Be Ready By November


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

The Phase 1 of the Mumbai coastal road project, from Marine Drive to Worli, is expected to be completed by November 2023. The first phase of the coastal road is being built by the Brihanmumbai Municipal Corporation at an estimated cost of Rs12,500 crore to speed up the suburban commute to and from South Mumbai

BMC planned to open Phase I, a 10.58-kilometre stretch from Marine Drive to Worli in south Mumbai, by November, said BMC chief engineer Mantayya Swami. Once completed, the ambitious coastal road project (phase 1) will add an 8.5 km long and 20-metre wide sea promenade to the city between Priyadarshini Park at Napean Sea Road and the Worli side of the Bandra Worli Sea Link

https://swarajyamag.com/news-brief/mumbai-coastal-road-project-marine-drive-worli-section-to-be-ready-by-november

Source: Swarajya

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter