Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
Phase 2 Of Coastal Road Project To Cost ₹922.92 Crore More - Re-mumbai

Re-mumbai

Phase 2 Of Coastal Road Project To Cost ₹922.92 Crore More


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

It will take an additional ₹922.92 crore and seven months to complete Phase 2 of the Coastal Road Project, comprising the stretch between Baroda Palace near Haji Ali and the Worli end of Bandra-Worli Sea Link. BMC Commissioner Iqbal Chahal recently approved the revised estimates submitted by the contractor, Hindustan Construction Company (HCC), which is executing Phase 2 in a joint venture with Hyundai Development Corporation (HDC).

Changes to the plan were necessitated following last year’s agreement between the BMC and fishing community in Worli. According to the original plan, the coastal road was supposed to be connected with the sea link through an elevated arterial bridge built on monopiles (pillars). However, the fishing community claimed that the gap between the pillars was not adequate for boats. The community wanted a 200-metre gap between the pillars, while the BMC recommended 60 metres. After protests by the fishermen, Chief Minister Eknath Shinde intervened and ordered the authorities to increase the gap to 120 metres.

https://www.freepressjournal.in/mumbai/mumbai-phase-2-of-coastal-road-project-to-cost-92292-crore-more

Source : Free Press Journal

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter