Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
Mumbai Metro Plans Two-Level Mega Depots For Multiple Lines To Increase Rake Capacity Amid Land Constraint Woes - Re-mumbai

Re-mumbai

Mumbai Metro Plans Two-Level Mega Depots For Multiple Lines To Increase Rake Capacity Amid Land Constraint Woes


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

As Mumbai endeavors to improve its public transport system through the ongoing development of an extensive metro network, it confronts the persistent challenge of land scarcity for corridor development and, car depots — that requires large plots of land.To tackle this issue, the Mumbai Metropolitan Region Development Authority (MMRDA) has proposed the creation of two-level parking spaces for metro rakes.

The first of these depots is currently being constructed at Mandale, Mankhurd, and similar plans are in place for Kanjurmarg and Kasheli. The Mandale depot will serve the elevated metro Line-2B. Kanjurmarg serves Line-6, which connects Swami Samarth Nagar in Andheri West to Vikhroli. Further, Kasheli serves Line-5 on the Thane-Bhiwandi-Kalyan line and Line-12 between Kalyan and Taloja.

https://swarajyamag.com/infrastructure/mumbai-metro-plans-two-level-mega-depots-for-multiple-lines-to-increase-rake-capacity-amid-land-constraint-woesSource : Swarajya

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter