Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
MMRDA launches second of longest steel decks on Mumbai Trans Harbour Link - Re-mumbai

Re-mumbai

MMRDA launches second of longest steel decks on Mumbai Trans Harbour Link


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

At 2,400 MT, these OSDs weigh as heavy as six large-sized aircraft and give a navigation space of 180 metres to ships traversing under the bridge without obstruction

The Mumbai Metropolitan Region Development Authority (MMRDA) Monday launched the second of the longest (180 metre) orthotropic steel decks (OSD) on the Mumbai Trans Harbour Link (MTHL) — a 22-km-long sea link that will connect South Mumbai to Navi Mumbai. The first of the 180-metre OSDs was launched earlier this year.

https://indianexpress.com/article/cities/mumbai/mmrda-launches-longest-steel-decks-mumbai-trans-harbour-link-8242654/

Source: The Indian Express

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter