Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
MMRDA opens phase 2 of Mumbai Metro Line 2A and 7 for the Public - Re-mumbai

Re-mumbai

MMRDA opens phase 2 of Mumbai Metro Line 2A and 7 for the Public


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

PM Narendra Modi has inaugurated metro services on Phase 2 of Mumbai Metro Line 2A and Line 7. The metro line 2A connecting Dahisar-E and DN Nagar is around 18.6 km long. while metro line 7 connecting Andheri-E Dahisar-E is around 16.5 Km long

The foundation stone of these lines was also laid by the Prime Minister in 2015. Providing seamless urban mobility has been one of the key focus areas of the Prime Minister. The both lines have been constructed at the cost of Rs12,600 crores under the administrative control of Mumbai Metropolitan Region Development Authority (MMRDA)

https://metrorailtoday.com/news/mmrda-opens-phase-2-of-mumbai-metro-line-2a-and-7-for-the-public

Source: Metro Rail Today

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter