MRIDC to construct 10 Road Over Bridges, 1 Road Under Bridge in Mumbai, suburbs at cost of Rs 1,675 cr
The Brihanmumbai Municipal Corporation (BMC) has entrusted the corporation with the construction work. The total estimated cost of these 11…
The Brihanmumbai Municipal Corporation (BMC) has entrusted the corporation with the construction work. The total estimated cost of these 11…
With this crucial challenge overcome, the implementing agency is looking at completing the entire project by June 2023 A long-standing…
Thane Creek Bridge 3 once ready, will ensure smooth traffic movement and hassle-free connectivity between the twin cities — Mumbai…
The Railways ministry is accelerating the redevelopment of major stations across India, including CSMT. They believe that the redevelopment will…
At 2,400 MT, these OSDs weigh as heavy as six large-sized aircraft and give a navigation space of 180 metres…
This bridge once completed will bring relief for motorists travelling from Mumbai to Thane, Nashik, Gujrat and Pune The Mumbai…
The development authority has invited tenders to construct the car depot at Kasheli for a 24.90-km long metro line, after…
The GMLR project will create an east-west corridor for traffic movement, connecting Mulund in the eastern suburbs with Goregaon in…
The existing jetty at Bhaucha Dhakka was built in 1979 to cater to a maximum of 300 boats but is…
The Railway Land Development Authority (RLDA), a statutory authority responsible for creating assets for the railways, was insisting on a…