Orange Gate–Marine Drive Tunnel Begins Work, Will Run Under 700 Buildings; June 2028 Delivery Target
December 6, 2025: Work has begun on Mumbai’s ambitious Orange Gate–Marine Drive twin tunnel, a 10 km east–west corridor that…
December 6, 2025: Work has begun on Mumbai’s ambitious Orange Gate–Marine Drive twin tunnel, a 10 km east–west corridor that…
October 7, 2025: Work on the long-awaited Thane–Borivli twin-tube tunnel is finally set to accelerate, with construction scheduled to begin…
Mumbai’s urban mobility is set for a major overhaul with the ambitious Mumbai Ring Road Project, a 90.18-kilometre infrastructure initiative…