BMC Stops Girgaon–Charni Road FOB Reconstruction Following Saifee Hospital Objection

December 4, 2025: Reconstruction of the long-pending foot overbridge (FOB) between Charni Road station’s east side and Dr Bhalerao Marg Sahitya Sangh in Girgaon has been halted after Saifee Hospital raised objections, leading to frustration among residents who have been waiting years for the bridge to be rebuilt. The FOB was demolished on public demand […]
Locals Oppose Demolition Of Gorai’s Poisar River Bridge Despite BMC’s CRZ Clearance

October 10, 2025: The Brihanmumbai Municipal Corporation (BMC) has received Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar Rive r bridge in Gorai, situated in Mumbai’s western suburbs. However, the project has drawn opposition from local residents, as the existing bridge serves as the only direct access route between Lower and Upper […]
BMC Proposes Demolition Of Gorai Bridge, Residents Raise Concerns Over Accessibility

October 9, 2025: The Brihanmumbai Municipal Corporation (BMC) has proposed the demolition of a 100-metre-long bridge over one of the inlets of the Poisar River in Gorai, western suburbs. The bridge serves as the only direct connection between the Lower and Upper Koliwada areas, prompting concerns among local residents about accessibility during the reconstruction period. […]