The connectivity will further be extended to platform 4, meant for fast Churchgate-bound locals, in the next two months
A new foot-over bridge, measuring eight-meter-wide and 58-meter-long, has come up at the Western Railway section of the Dadar station. Built with Rs 8 crore, the FOB connects platforms 1,2,3,5, and east skywalk. The connectivity will further be extended to platform 4, meant for fast Churchgate-bound locals, in the next two months.
https://www.freepressjournal.in/mumbai/mumbai-new-western-railway-foot-over-bridge-comes-up-at-dadar-station
Source: The Free Press Journal