Western Railway has drawn up plans to construct a 10-line coaching depot at Currey Road in Mumbai at an estimated cost of Rs 98 crore. The facility is expected to strengthen train maintenance and parking capacity, creating scope for additional long-distance services from Mumbai Central and Dadar. The project is targeted for completion by December 2028.
Spread across approximately 55,000 square metres of railway land between Currey Road and Lower Parel, the proposed depot will comprise two pit lines for routine maintenance, six stabling lines for parking trains and two sick lines for detailed inspections and repairs. The infrastructure will also cater to the maintenance requirements of Vande Bharat trains.
According to a report by the news agency, Western Railway plans to initiate the contractor tendering process by February 2027. The land has already been handed over to the railway zone. However, a Central Railway store depot currently occupying the site must first be shifted to Thakurli before construction can begin.
Additional capacity for long-distance trains
Western Railway currently operates 1,414 suburban services and approximately 200 Mail and Express trains daily. Mumbai Central, a major terminal for long-distance services, faces space constraints, limiting opportunities to expand existing coaching and maintenance facilities.
Located around 2 km from Mumbai Central and 2.5 km from Dadar, the proposed depot will take over part of the maintenance and stabling requirements currently handled at Mumbai Central.
Western Railway chief public relations officer Arun Meena said: “The depot will provide additional capacity for maintenance, inspection and parking of trains. This will help create the necessary infrastructure to introduce more long-distance services from Dadar and Mumbai Central in the future.”
The latest proposal includes six stabling lines and two sick lines, compared with seven stabling lines in the plan reported in April. The project is part of broader railway infrastructure efforts to increase terminal capacity and accommodate more train services in major cities.
Source: Railway Supply



