October 11, 2025: Navi Mumbaikars can look forward to a new cultural landmark as the Airoli Natyagruha theatre is set to be completed by early next year, offering a venue on par with the popular Vishnudas Bhave Natyagruha in Vashi. Navi Mumbai Municipal Commissioner Dr. Kailas Shinde recently inspected the ongoing construction at Plot No. 37, Sector 5, Airoli, urging officials to expedite work while maintaining quality standards.
Dr. Shinde was accompanied by City Engineer Shirish Aradwad, Additional City Engineer Arvind Shinde, and Executive Engineer Sanjay Patil during the visit. He reviewed the project’s progress, examined architectural details, and provided guidance on adhering to the construction timeline.
The upcoming four-storey theatre will have a total seating capacity of 860, with two basement levels dedicated to parking for cars and two-wheelers. The ground floor will feature a main entrance lobby, reception, ticketing office, food counters, administrative offices, and a separate entry for stage materials.
The first floor will house the main auditorium with 478 seats, a stage area, sound control room, and rehearsal hall. The second floor will include a multi-purpose hall with 382 seats, storage rooms, and a make-up room for female performers. The third floor will accommodate a make-up room for male performers and sound/light control rooms, while the fourth floor will contain a VIP lounge and artist facilities.
The building will be equipped with six passenger lifts and one hydraulic lift to ensure smooth movement throughout the facility.
“Approximately 65% of the work has already been completed. The project team has been instructed to accelerate the remaining construction to ensure completion by the start of the new year,” Dr. Shinde stated.
The Airoli Natyagruha is expected to address the increasing demand for cultural spaces in Navi Mumbai, further enhancing the city’s reputation as a hub for performing arts following the success of the Vishnudas Bhave Natyagruha in Vashi.