Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39
At 35 km, Wadala TT-Gaimukh Metro boasts of max length - Re-mumbai

Re-mumbai

At 35 km, Wadala TT-Gaimukh Metro boasts of max length


Warning: Trying to access array offset on value of type bool in /home/exv9hly8choo/public_html/wp-content/plugins/pro-elements/modules/dynamic-tags/tags/post-featured-image.php on line 39

So far, more than 45% of the project’s civil work has been completed

The under-construction Metro lines 4 and 4A, connecting Wadala TT to Gaimukh, will be the Mumbai Metropolitan Region’s longest rail corridor having a length of 35.25 km, 32 stations and 5 interchanges en route. In fact, this Metro line will speedily bridge the distance between Thane and the island city.
Source: The Free Press Journal

Share this post :

Leave a Reply

Your email address will not be published. Required fields are marked *

Related News

Subscribe our newsletter