 
                    
    Ulwe Coastal Road To Connect Atal Setu With Navi Mumbai Airport By 2026, Cutting Travel Time By 25 Minutes
October 29, 2025: The much-anticipated Ulwe Coastal Road, designed to link the Mumbai Trans Harbour Link (Atal Setu) directly with…
 
                    
    October 29, 2025: The much-anticipated Ulwe Coastal Road, designed to link the Mumbai Trans Harbour Link (Atal Setu) directly with…
 
                    
    October 27, 2025: The long-awaited Panvel–Karjat suburban railway corridor, a major infrastructure project under the Mumbai Urban Transport Project (MUTP)…
 
                    
    October 8, 2025: The upcoming Navi Mumbai International Airport (NMIA), slated for inauguration on October 8, is accelerating major railway…
 
                    
    September 3, 2025: Mumbai is poised for a sweeping urban transformation, with infrastructure projects worth $100 billion set to reshape…
 
                    
    The Airoli-Ghansoli Bridge and the Palm Beach Road expansion are being built by the Navi Mumbai Municipal Corporation (NMMC) in…